Browse Items (8302 total)

Crayon, graphite and metallic paint on sketch paper mounted on board
36.5" x 19"

The event depicted on the seal is the signing of the peace treaty between Chief Pontiac (Ottawa) and Brig. General Anthony Wayne in 1796. Between the men stands a…

Graphite on tracing paper
18.75" x 23.75"

The erection of The Spirit of Detroit at the City-County Building (now Coleman A. Young Municipal Center) in 1958 marked the formal completion of the structure whose construction began in 1951. Located in…

Graphite on tracing paper
18.75" x 23.5"

The erection of The Spirit of Detroit at the City-County Building (now Coleman A. Young Municipal Center) in 1958 marked the formal completion of the structure whose construction began in 1951. Located in…

Graphite on tracing paper
18.75" x 20.75"

The erection of The Spirit of Detroit at the City-County Building (now Coleman A. Young Municipal Center) in 1958 marked the formal completion of the structure whose construction began in 1951. Located in…

Graphite on tracing paper
18.75" x 24"

The erection of The Spirit of Detroit at the City-County Building (now Coleman A. Young Municipal Center) in 1958 marked the formal completion of the structure whose construction began in 1951. Located in…

Head of a swan or duck. This head is plaster and a metal flexible tube with wood makes up the neck. There is an eye hook in the top of the swans head.

Graphite and oil pencil on tracing paper
16.5" x 13.75"

The erection of The Spirit of Detroit at the City-County Building (now Coleman A. Young Municipal Center) in 1958 marked the formal completion of the structure whose construction began in…

Colored pencil and graphite on tracing paper
16.5" x 14"

The erection of The Spirit of Detroit at the City-County Building (now Coleman A. Young Municipal Center) in 1958 marked the formal completion of the structure whose construction began in…

Graphite on tracing paper
18.5" x 11.5"

The erection of The Spirit of Detroit at the City-County Building (now Coleman A. Young Municipal Center) in 1958 marked the formal completion of the structure whose construction began in 1951. Located in…

Large board section with part of Chief Pontiac drawing on the white surface. Brown clay stains are on the surface.
Output Formats

atom, dcmes-xml, json, omeka-xml, rss2